Product

From PRD to shipped, with the dependencies drawn.

Lay PRDs on a dependency canvas, plan with an assistant that proposes instead of editing, and let a merged PR mark the work shipped. Then find out whether it fixed the problem.

creator-platform Β· Roadmap
Blocks Follows Relates Draft Reviewed Ready Shipped
reviewed0.71
Payout status webhook
1a94e35a~4–9 dπŸ“‘ 5
LIN EUL-15
shipped0.64
Analytics CSV export
c3d1f0b2
PR #482βˆ’18% signals
readyup next0.86
Creator Payout SLA & Transparency
6a4e2dcc~6–11 dπŸ“‘ 12
draft0.58
Payout delay alerts
9f2e7c41
draftblocked by 10.49
Gift earnings live tile
58d98818no datesπŸ“‘ 2
2AI proposes 2 changesReject allAccept all

From plan to proof.

  1. 1

    Draw the dependencies

    Features are nodes. An edge says one blocks, follows or relates to another, and a change that would create a loop is refused.

  2. 2

    Plan with the assistant

    Describe a change in plain words. It proposes nodes and edges as drafts on the canvas, with the effect on the schedule.

  3. 3

    Ship from the PR

    Link a GitHub pull request. When it merges and its checks pass, the PRD is marked shipped.

  4. 4

    Measure the result

    Push the work to Linear. After the issue closes, Euler compares complaints on that theme in the 30 days before and after.

Edits wait for you

The roadmap assistant proposes new features, updates, deletions and dependencies as ghost nodes on the canvas. Accept all of them, pick some, or reject the lot.

  • Each proposal shows its effect on the schedule
  • Loops are caught before you accept
  • Nothing is written until you do
reviewed0.71

Payout status webhook

1a94e35a

draft0.58

Payout delay alerts

9f2e7c41

2AI proposes 2 changesReject allAccept all

Shipped means merged and green

Add an Euler-Spec line to the pull request, or link it in the app. When it merges and every CI run passes, the PRD is marked shipped, and the delivery chain shows each step.

  • A guess from a branch name waits for a person to confirm it
  • Requirements still awaiting approval can hold shipping back
  • Unknown means Euler can't see the evidence, never that it passed

Delivery chain

From tracker issue to outcome review. Unknown means Euler can't see the evidence, never that it passed.

  1. IssueDoneMON-131

    Tracked in Linear

  2. Pull requestDone#482 Payout delay alerts

    Linked by the Euler-Spec line in its description

  3. ChecksDone

    4 of 4 workflow runs passed

  4. MergeDone

    Merged Oct 3

  5. MeasurementIn progresscurrent

    Comparing the 30 days before and after MON-131 closed

  6. Outcome reviewWaiting

    Waits for the measurement

Proof it worked, or not yet

After launch, Euler compares customer-signal volume for the theme before and after, with a confidence label. A launch without enough data says so.

  • High, Medium, Low or Insufficient data
  • High means the whole interval clears a 10% change
  • Review a launch against its success metrics: hit, missed or mixed
Payout status pageMON-109 β†—
30d window23 β†’ 12↓ 48%High
Analytics CSV exportMON-098 β†—
30d window9 β†’ 7↓ 22%Insufficient data
Tax form statusMON-121 β†—
Measuring impactMeasuring

The details.

Learned schedules
Once your team has closed enough Linear cycles, the roadmap shows time windows learned from your own delivery history. Until then it doesn't guess.
Commitments tracked
Decisions with an owner and a due date are checked daily against Linear, Jira and GitHub. When one starts slipping, its owner gets a Slack message to mark it done, push it a week, or hand it back.
Dependency risk
Risky dependencies are flagged on the canvas, and scope that drifts from an approved plan is flagged in the PRD.
Effort sizes
T-shirt sizes per feature, calibrated from your overrides and, once there's enough, your delivery history.
Partial apply
If one change in a batch can't apply, it's rolled back alone, the rest go through, and you're told which.
Push anywhere
Send a PRD to Linear with sub-issues, or to Jira as a single issue.

Where it stops.

  • No invented dates

    Schedules are relative windows from measured history, never calendar dates pulled from thin air.

  • No silent edits

    The assistant can't change the canvas until you accept.

  • No early verdicts

    A launch shows Measuring until its full window has passed. Before-and-after can't rule out everything else that changed, and the confidence label says how sure it is.

Questions, answered.

Linear, for now. Work pushed to Linear is measured once the issue closes. Jira pushes aren't measured yet.

Then a merged pull request that's confirmed as linked is enough to mark the PRD shipped.

Yes, per organization, from the 30-day default up to a year.

Stop drowning in feedback. Start shipping the right thing.

Join the waitlist

We're putting the agents through their paces. When early access opens, the waitlist hears first.